翻訳と辞書
Words near each other
・ Big Biz Tycoon
・ Big Biz Tycoon 2
・ Big Black
・ Big Black Bugs Bleed Blue Blood
・ Big Black Delta
・ Big black delta
・ Big Black Delta (album)
・ Big Basin Redwoods State Park
・ Big Bass Lake, Pennsylvania
・ Big bath
・ Big Battle of Egos
・ Big Battle, West Virginia
・ Big Bay
・ Big Bay (Southland)
・ Big Bay Boom
Big Bay Dam
・ Big Bay de Noc
・ Big Bay Point Light
・ Big Bay Short Range Radar Site
・ Big Bay sloop (shipwreck)
・ Big Bay State Park
・ Big Bay Water Aerodrome
・ Big Bay, Illinois
・ Big Bay, Michigan
・ Big Bazaar
・ Big Bazaar (Rourkela)
・ Big Beach
・ Big Beach (company)
・ Big Beach Boutique II
・ Big Beach Boutique II – The Movie


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Big Bay Dam : ウィキペディア英語版
Big Bay Dam

Big Bay Dam was an earthen dam located 11 miles west of Purvis, Mississippi in Lamar County. On March 12, 2004 the Big Bay dam embankment failed through piping in the vicinity of the principal spillway 12 years after construction. A peak breach flow of 147,000 ft3/s (4,200 m3/s) was estimated from the breach geometry, breach timing and the reservoir volume. The Big Bay embankment, which is largely intact, is approximately 1890 feet long and 51.3 feet high. The failure occurred with an initial water surface about 6 inches (0.15 m) above the normal pool elevation of 278.0 ft (84.73 m), releasing 14,200 ac-ft (17,500,000 m3) of water and inundating 14.3 miles (23.0 km) of valley to depths of up to 33 ft (10 m) from the dam to the Pearl River. Woody material was stripped from the stream valley for a length of 2300 ft (700 m) immediately below the dam, after which velocities decreased to such an extent that little vegetation was uprooted.
The inundation impacted Bay Creek and Lower Little Creek in Lamar and Marion Counties. A damage assessment 〔MEMA. 2004. “NEWS: Governor Barbour requests federal assistance.” News release, Mississippi Emergency Management Agency, March 22, 2004.〕 indicated that, within Lamar County, 26 homes were destroyed, 8 homes had major damage, 8 homes had minor damage, 25 mobile homes were destroyed and 1 mobile home had minor damage. In Marion County, 1 home was destroyed, 13 homes had major damage, 12 homes had minor damage, 1 mobile home was destroyed, 3 mobile homes had major damage, 3 mobile homes had minor damage, Pine Burr Church suffered major damage, Hub Chapel Church had minor damage, and the Pinebur Volunteer Fire Department suffered major damage. In all, 104 structures were documented as damaged or destroyed.〔 No human lives were lost.〔
The dam breach characteristics, specifically the breach geometry and formation time, were estimated by Yochum et al. 2008. The breach width was measured to be 230 ft (70 m), with a top width of 315 ft (96 m), right side slope of 0.61 and a left side slope of 1.3 (horizontal/vertical). In regard to the breach timing, increased discharge from a pre-existing seep was first noticed on Thursday, March 11.〔Burge, T.R. (2004) Big Bay Dam: Evaluation of Failure Land Partners Limited Partnership, Hattiesburg, MS.〕 The seep gradually increased its discharge, with the flow carrying material by the next morning. At mid-morning on March 12 the seep was inspected and was noticed that it had about a ½ inch of head height. By 12:15 water “shot up out of the hole”. Shortly after this the seep was observed to be “spouting approximately 2 to 3 ft in height, with a diameter of about 18 inches”. The area around the boil then collapsed and the embankment began to rapidly erode. This is the point where the breach is assumed to start, at about 12:20. The final breach dimensions occurred from about 13:10. Full formation is assumed to occur at 13:15—the breach formation time is estimated to be 55 minutes.〔(Report from National Oceanographic and Atmospheric Administration (NOAA) in Jackson, MS )〕
==References==